DESCRIPTION OF THE WORK

 
The second CityLife skyscraper is part of a large urban redevelopment project in the former Trade Fair District of Milan. The “Twisted One”, designed by the star architect Zaha Hadid, is a tower with a rhombus plan. It rises for 43 floors with 170 m of cement and glass, twisting on itself with respect to the urban landscape.
 
Great attention has been paid to environmental sustainability and the limitation of the energy costs of the structure, for which certification is planned on the basis of the LEED 2009 standard for Core & Shell with a PLATINUM level. At the foot of the building, mainly for business use, a shopping centre and a number of covered walkways joining to the Tre Torri subway station of the M5 line have been developed. The building has a reserved and underground car park with around 380 car spaces. It houses the Milan site of Assicurazioni Generali.

cmb-construction-torre-hadid-tower-facciata-facade

“When we ordered the façade pieces from China, the whole of Europe thought: they’ll never do it. Instead, it’s perfect. Every piece is different from another, just how it should be.”.

 
Marco Cruciani
Project Manager

Dealing with the twist: an engineering challenge

To “fix” the twist in the structure, pieces of metal to make the nucleus more rigid were inserted in every floor. Once installed, the metal was then pulled to contrast the torsion. “Without these “tricks”, once arriving at the fourth floor, the tower would have folded in on itself,” explains the project manager Marco Cruciani.

hadid-cmb-960

Timeline

April 2018

The crane is installed to put up the “Generali” sign

A crane is set up to install the “Generali” sign with a helicopter arriving from Switzerland. It’s a crucial day: everything is assembled in one and a half hours thanks to the work of 30 men. It’s an acrobatic job attracting many curious onlookers and stunning Milan’s inhabitants at dawn.

cmb-construction-torre-hadid-tower-april-2018
cmb-construction-torre-hadid-tower-october-2017

October 2017

Hadid Tower opens to the public thanks to FAI

A great success for the extraordinary opening of the skyscraper in the CityLife area in Milan during FAI Day (Fondo ambiente italiano – the National Trust of Italy) in autumn. There were long queues to go up to the 19th floor, where a guide led the visitors in an exploration of a “typical” completed floor of the structure.

February 2016

Work begins on the façades

Containers arrive from China, bit by bit because there’s not enough space for storing the entire lot. Every piece is different, one from another, and was therefore carefully numbered and catalogued. Everything goes to plan.

cmb-construction-torre-hadid-tower-facciata-facade-february-2016
cmb-construction-torre-hadid-tower-students-visit-november-2015

November 2015

90 engineering students from the University of Trento visit the Citylife area

The visit program was divided into three different training parts: the technical management of the building site (economic administration, organization and planning of the works, logistics); a visit to the building site; the design complexity of the work and the advanced application of BIM in the field.

January 2015

First elevations in reinforced concrete

Work starts from the basement floors above the foundation. 800 sq. m. of floor area are cast every day. In April the above ground elevations are cast, and will be completed within a year: a floor is built every six days.

cmb-construction-torre-hadid-tower-january-2015
cmb-construction-torre-hadid-tower-fondamenta-december-2014

December 2014

The foundations of the Hadid skyscraper are laid

The gigantic strip foundation is laid which will support the skyscraper. 7,500 cubic meters of cement are used for the foundation: a sort of monolithic element to support the building which will rise to around 200 meters is put in place.

June 2013

The twisted tower is arriving

CMB is awarded the contract for the new Milan tower, thanks to the best technical-economic bid, while the contract is signed in the month of July.

cmb-construction-torre-hadid-tower-render-june-2013

Value of the works
125,742,898.29 euro

Client
CityLife Spa

Role in the project
Execution of all the works

Completion time
March 2014 – in progress

">