CMB Carpi Logo Retina
  • Home
  • Company
    • What We Do
    • Values
    • History
    • Governance
    • Results
    • Commitment
    • Certifications
  • Sustainability
  • Media
    • News
    • Video
    • House Organ
    • Press Release
    • Press Kit
  • Work with us
    • Job opportunities
    • spontaneous application
    • Us Internship
  • Become a supplier
  • Contacts
    • Contacts
    • Contacts Milan Headquarter
    • Contacts Rome Headquarter
  • Projects
  • Facility Management
  • People
  • Safety
  • Innovation
    • Building Information Modeling
    • Success Project
    • Leed Certification
  • IT
  • EN
  • Home
  • Company
    • What We Do
    • Values
    • History
    • Governance
    • Results
    • Commitment
    • Certifications
  • Sustainability
  • Media
    • News
    • Video
    • House Organ
    • Press Release
    • Press Kit
  • Work with us
    • Job opportunities
    • spontaneous application
    • Us Internship
  • Become a supplier
  • Contacts
    • Contacts
    • Contacts Milan Headquarter
    • Contacts Rome Headquarter
  • Projects
  • Facility Management
  • People
  • Safety
  • Innovation
    • Building Information Modeling
    • Success Project
    • Leed Certification
  • IT
  • EN
  • IT
  • EN
12/11/2024
cmb-ospedali-genova-gaslini-hospital-preview

cmb-ospedali-genova-gaslini-hospital

Gaslini Hospital

GENOA
ITALY

New Gaslini: a Beacon of Excellence in Paediatrics in Genoa

The New Gaslini Hospital in Genoa was established through a comprehensive project focused on technological, organisational and functional innovation, made possible by a public-private partnership.

The objective is to create a flexible, welcoming and safe architectural space aligned with key environmental sustainability protocols. This challenge aims to shape the future of the institute, which has been a leading reference point for paediatric care, research, and medicine at an international level for eighty-five years. The New Gaslini is, therefore, poised to fully realise the vision of Senator Gerolamo Gaslini, who, in the 1930s, dreamed of creating an institute of excellence in memory of his daughter, who passed away at a young age.
MAYOR’S WORDS
“The project will contribute to a futuristic and sustainable urban development in one of Genoa’s most prestigious areas.”
icon-gallery
icon-gallery
cmb-ospedali-genova-gaslini-hospital
cmb-ospedali-genova-gaslini-hospital-maps
cmb-ospedali-genova-gaslini-hospital
cmb-ospedali-genova-gaslini-hospital
cmb-ospedali-genova-gaslini-hospital
cmb-ospedali-genova-gaslini-hospital
73
thousand square metres of expansion
493
total beds
8
labour rooms
Technical Description
The “Cantiere Nuovo Gaslini” construction plan includes the development of a new hospital pavilion, named “Pavilion Zero”, along with a technological centre and the renovation of five historical pavilions. The project will be carried out in four stages, with a total duration of approximately six years. Stage 1 will see the construction of Pavilion Zero and the new Technological Centre, while all renovations of the various pavilions are expected to be completed by 2030. During all stages of construction, the institute will continue its normal operations to ensure that children, families and staff members are respected and supported.
cmb-ospedali-genova-gaslini-hospital-pad-zero-render

Padiglione Zero

Padiglione Zero (Pavilion Zero) will be the central hub for emergency and urgent care, housing all intensive care and surgical functions for children, expectant mothers and families. This development will enable the Gaslini Hospital in Genoa to achieve operational excellence by integrating cutting-edge technologies and providing high-quality care. The total number of beds at the Genoa hospital will increase to 493, adding approximately 50 more beds than its current capacity.

19 years of facility management

Once the construction of Pavilion Zero is complete, facility management services, including energy supply, will be provided for 19 years.
cmb-ospedali-genova-gaslini-hospital-facility-management

Timeline

October 2023

Signing of the Agreement

Renato Botti, General Director of the IRCCS Istituto Giannina Gaslini, signs an agreement with Zena Project, a consortium formed by the temporary grouping of the companies CMB, RenovIT and Arcoservizi.
cmb-ospedali-genova-gaslini-hospita-firma-Renato-Botti
cmb-ospedali-genova-gaslini-hospital-viabilita-esterna
January 2024

Everything Revolves around Gaslini

Modifications to the road system around the construction site begin in order to facilitate the transit of material supply vehicles.
July 2024

“Dinosaur” shears start work

The construction site officially opens. In the presence of the Institute’s top management and local officials, demolition shears “disguised” as a dinosaur kicks off the demolition work, entertaining children with a dinosaur-themed show.
cmb-ospedali-genova-gaslini-hospital-pinza-dinosauro
cmb-ospedali-genova-gaslini-hospital-cantiere
September 2024

The Building Site Advances

The construction site moves forward with the demolition of Pavilions 7 and 8, which requires relocating personnel and establishing protected pedestrian walkways. Monitoring of dust and noise levels has shown results well below the planned thresholds.
Three figures
20 pavilions
1800 employees
55.78% participation of CMB
Client
IRCCS Istituto Giannina Gaslini
Role in the project
CMB is part of the Zena Project, a temporary grouping of companies with Mieci and Arcoservizi.
Completion times
Start: October 2023
End of Structural Work: June 2026
Completion of Pavilion 0: October 2026
see also

Niguarda Ca’ Granda Hospital Milan

2013

Borgo Roma and Borgo Trento Hospitals Verona

2017

Odense Hospital Complex Odense (Denmark)

 
Share this page
Share this page
Back to top
CMB Carpi Logo

P.IVA 00154410369
Registro delle Società di Modena
n. 00154410369 – C.C.I.A.A. 2698
Albo Cooperative n. A100255

©2023 CMB
Cooperativa Muratori e Braccianti di Carpi
Tutti i diritti riservati / All rights reserved

PROJECTS

FACILITY MANAGEMENT

PEOPLE

SAFETY

INNOVATION

COMPANY
What we do
Values
Enterprise’s History
Governance
Results
Commitment
Certifications
Becoming Supplier

WORK WITH US

SUSTAINABILITY

MEDIA
News
Video
House Organ
Press Release
Press Kit

SOCIAL NETWORK
Linkedin
Youtube

CONTACTS
Headquarter
via C. Marx 101 Carpi (MO) – ITALY
Ph +39 059 6322111
Fax +39 059 691079

Privacy Policy
Cookie Policy
Credits