
Video from construction sites
Design, works, constructions
CITYLIFE’S HORIZONTAL FUTURE
A CMB architect reveals the secrets of CityWave and its spectacular suspended wooden roof.FORCES ON THE FIELD
CMB utilised its own equipment and more than 230 personnel, mostly from within the company.POST-COVID HEALTHCARE
The new facilities are a response to the challenges presented by the pandemic, which required the creation of highly adaptable, isolated rooms and intensive care beds.THE BUILDING WITH RIBBON WINDOWS
Careful tailor-made work and details that make the difference in limiting heat loss
STATE-OF-THE-ART BRIDGE
Designed in line with the Environmental and Landscape Heritage body directives, Noicattaro bridge was built in ancient stone imitating the existing one.A RECORD-BREAKING DOME
The structure, made with rectangular windows and steel, is one of the biggest in ItalyTHE HOSPITAL OF THE FUTURE
Denmark’s largest newly built hospital in figures.
FACILITY MANAGEMENT
In the hospital in Verona, a digitised system allows for the complete traceability of maintenance work and hospital services.FORMWORKS AND RADIUS OF CURVATURE
Designed in accordance with different radii of curvature, the formworks create curved walls throughout and not divided into sectors.THE FUTURE HOSPITAL IN 3D
Technology looks to the future: the Odense hospital in a hologram developed with the ATI ProjectUNPLASTERED FACADES AND STEEL
The Santa Marta Hall of Residence in Venice unites past and present, thanks to the expert use of materials.THE CROWN, ONE STEP FROM THE SKY
The building site manager Alfio Musumeci describes the “crown”, the important metallic structure that completes the curve of the Milanese tower.A HEART STRENGTHENED BY STEEL
The structure of the Pordenone hospital is anti-seismic: the site manager Carmine Lombardi describes the metal reinforcement.A FOOD COURT IN RECORD TIME
The designs changed while the work was in progress and an area entirely dedicated to catering was created in a few months.THE RESTORATION IS PERFORMED
The archaeological digs, the rebuilding, the restoration down to the smallest detail, and, finally, the inaugurationTop floor
The flag ceremony, which was placed on the 30th floor, celebrates the completion of the building’s roof.SOTTOTERRA
L’intervento si è svolto oltre i 4 mt. di profondità e ha riguardato anche cavi e tubature della rete idraulica, fognaria e delle utenze.CARPI CATHEDRAL
In the words of Alessandro Zuccoli, the long, patient restoration work carried out after the earthquake of 2012.THE GALFA TOWER IS PART OF MILAN’S HISTORY
From the idea to the design; from the design to the construction: this is how an historical building is coming back to life, preserving Bega’s original layout.L’ORA DELL’ESPLOSIVO
Dopo la costruzione del nuovo viadotto, la demolizione della vecchia infrastrutturaSPACE FOR THE PIETÀ BANDINI
Michelangelo’s masterpiece was moved and enhanced thanks to a new location.RIGHT UP TO THE SKY: A JOURNEY IN HADID TOWER
Marco Cruciani recounts an extraordinary experience in Italy, which contributes to changing the Milan skyline. The pillars with exposed concrete are one of the most original features.PERSONE, PROGETTI, VALORI
CMB verso il futuro: competenze, valori e storie delle persone che ogni giorno costruiscono un pezzo di domaniINTEGRARE COSTRUZIONI NUOVE ED ESISTENTI
Il project manager Alessio Baldoni racconta l’esperienza di progettazione e costruzione nell’ospedale Borgo RomaTRA VIADOTTI E GALLERIE
Un’opera nevralgica per il collegamento autostradale del sud Italia“SICURI PER MESTIERE”
Nel cantiere di F.I.CO. il metodo made in CMB per un impegno concreto per la sicurezzaIN VOLO SULLA TORRE HADID
Uno sguardo dall’alto sull’area CityLife che cambierà lo “skyline” di Milano