CMB Carpi Logo Retina
  • Home
  • Company
    • What We Do
    • Values
    • History
    • Governance
    • Results
    • Commitment
    • Certifications
  • Sustainability
  • Media
    • News
    • Video
    • House Organ
    • Press Release
    • Press Kit
  • Work with us
    • Job opportunities
    • spontaneous application
    • Us Internship
  • Become a supplier
  • Contacts
    • Contacts
    • Contacts Milan Headquarter
    • Contacts Rome Headquarter
  • Projects
  • Facility Management
  • People
  • Safety
  • Innovation
    • Building Information Modeling
    • Success Project
    • Leed Certification
  • IT
  • EN
  • Home
  • Company
    • What We Do
    • Values
    • History
    • Governance
    • Results
    • Commitment
    • Certifications
  • Sustainability
  • Media
    • News
    • Video
    • House Organ
    • Press Release
    • Press Kit
  • Work with us
    • Job opportunities
    • spontaneous application
    • Us Internship
  • Become a supplier
  • Contacts
    • Contacts
    • Contacts Milan Headquarter
    • Contacts Rome Headquarter
  • Projects
  • Facility Management
  • People
  • Safety
  • Innovation
    • Building Information Modeling
    • Success Project
    • Leed Certification
  • IT
  • EN
  • IT
  • EN
04/12/2020
cmb-hospitals-ospedali-san-gerardo-monza-italy-share

cmb-hospitals-ospedali-san-gerardo-monza-italy

San Gerardo Hospital

MONZA
ITALY

More space and comfort for patients

Monza’s hospital gains in new surface area and extends its expected lifespan with the renovation of the existing areas.
A more rational layout of rooms and circulation paths, seismic-resistant and energy-saving solutions, improved comfort for both patients and healthcare professionals: these are the points of strengths of CMB’s intervention, led by the top experts of the Healthcare Business Unit.

Phase after phase, intelligent building approaches have been expertly applied in the existing context, seeking to respect the time scheduling and flows of health care activities. When building wellbeing, it’s essential to limit noise, dust and other disturbances for patients and staff.
The 1960s-era building has been given a new lease of life, emerging as a fresh model of renovation ready to tackle the challenges of the future.

THE HOSPITAL BUILDING SITE
Allowing the building site activities to proceed at the same time as the health care activities: a challenge won by CMB, which limited its impact and interferences

icon-gallery
icon-gallery
cmb-hospitals-ospedali-san-gerardo-monza-gallery1
cmb-hospitals-ospedali-san-gerardo-monza-gallery2
cmb-hospitals-ospedali-san-gerardo-monza-gallery3
cmb-hospitals-ospedali-san-gerardo-monza-gallery4
cmb-hospitals-ospedali-san-gerardo-monza-gallery5
cmb-hospitals-ospedali-san-gerardo-monza-gallery6
cmb-hospitals-ospedali-san-gerardo-monza-gallery7
cmb-hospitals-ospedali-san-gerardo-monza-gallery8
cmb-hospitals-ospedali-san-gerardo-monza-gallery9
cmb-hospitals-ospedali-san-gerardo-monza-gallery10
cmb-hospitals-ospedali-san-gerardo-monza-gallery11
cmb-hospitals-ospedali-san-gerardo-monza-gallery12
153
Specialist out-patient rooms
725
Beds
20
Years – Duration of the project finance concession
Technical Description

The new hospital will be conceived as a “hospital-city”: a complex, multifunctional system comprising areas with varying levels of protection and accessibility, designed to be used by all citizens. The project for the redevelopment of the San Gerardo Hospital in Monza was aimed at adapting the structure to significant organisational, health care and technological changes which have been modifying patient care procedures over the last few years.
To this end, the redesign of the hospital complex included the construction of new connecting structures between existing and newly built buildings, optimising the movement of both external visitors and internal users through covered internal pathways.
The first phase of the works involved the construction of a New Building for the CUP and out-patient rooms, the partial renovation of an Existing Building, the construction of the new connecting structures, and the renovation of a floor in the building called “Tenaglia”.
Subsequent phases focused on the renovation of the Monoblock building, which was divided into three sectors – A, B, and C – with each phase of work addressing only one sector. To keep the building – primarily used for in-patient wards – operational and maintain the number of accredited beds, preparatory works were planned before each phase to maximise bed availability in the wards not affected by renovation. The first sector to be renovated was the central one (B), followed by the eastern sector (C), and finally the western sector (A).

Vertical and horizontal connections

Compared with the 1960s-era structure, the lifts have been repositioned to free up space and create a continuous longitudinal axis. Medical offices are located to the north and within two rear diamond-shaped volumes, while in-patient rooms now face south, enhancing patient wellbeing.

cmb-hospitals-ospedali-san-gerardo-monza-italy-esterno

After the construction: CMB takes care of the services

Developed according to the Concession with project financing formula, the project included the design, construction and management of the services. The concession provides for the management of important supply and maintenance services: staff canteen, catering for the patients, laundry, waste management, cleaning and porter service, building maintenance, heating system and its management.

“There’s a laudable spirit of sacrifice, with the result that the building site around the hospital structure has had no impact on its excellent health services. This result could not be taken for granted.”

Dottor Mario Alparone
General Director of Monza Local Healthcare Area.

Timeline

cmb-hospitals-ospedali-san-gerardo-monza-italy-facciata
August 2024

A façade facing the mountains

Work begins on the façade structure of the south front, featuring a composition of coloured panels that stylise and reinterpret the profile of the Lombardy Prealps.
June 2021

Phase 3: time for Sector C

A new phase begins in Sector C, involving the structural reinforcement of 1,800 columns and the installation of 170 prefabricated bathroom units.
cmb-hospitals-ospedali-san-gerardo-monza-italy-settore-C
cmb-hospitals-ospedali-san-gerardo-monza-italy-settore-B
July 2020

Sector B completed

Sector B has been inaugurated, following the remodelling of the in-patient rooms and the creation of a new connective pathway running seamlessly through Sectors A, B, and C along the longitudinal axis. The lifts were demolished and rebuilt.
March 2017

Monoblock: phase 2 gets underway, with the hospital in operation

The building site moves on to the central sector of the 11-floor monoblock, a place of great health care activity. The work follows a precise time schedule, so as to make the intervention compatible with the continuation of the healthcare service.

Spring 2015

The new building is ready

The first phase is completed: the New Forepart, called “Palazzina Accoglienza” (Reception Building) is ready to accommodate outpatient rooms and day hospitals. The Tenaglia pavilion and the Existing Forepart have also been renovated.

September 2013

Start of the works, including redevelopment and new construction

Starting with the construction of a building in front of the previous “New Forepart” structure and the renovation of the building called Existing Forepart. The work aims for a radical modernization and redevelopment of the hospital.

August 2012

CMB is awarded the tender

Definitive award of the concession contract for the construction and renovation of the San Gerardo Hospital in Monza on account of the commissioning body, Infrastrutture Lombarde Spa

Value of the works
162,929,562.65 euros
Client
Infrastrutture Lombarde Spa
Role in the project
Agent Member of the group of Builders
Completion times
Start: 2013 – End: 2025
see also

Niguarda Ca’ Granda Hospital Milan

2013

Borgo Roma and Borgo Trento Hospitals Verona

2017

Odense Hospital Complex Odense (Denmark)

 
Share this page
Share this page
Back to top
CMB Carpi Logo

P.IVA 00154410369
Registro delle Società di Modena
n. 00154410369 – C.C.I.A.A. 2698
Albo Cooperative n. A100255

©2023 CMB
Cooperativa Muratori e Braccianti di Carpi
Tutti i diritti riservati / All rights reserved

PROJECTS

FACILITY MANAGEMENT

PEOPLE

SAFETY

INNOVATION

COMPANY
What we do
Values
Enterprise’s History
Governance
Results
Commitment
Certifications
Becoming Supplier

WORK WITH US

SUSTAINABILITY

MEDIA
News
Video
House Organ
Press Release
Press Kit

SOCIAL NETWORK
Linkedin
Youtube

CONTACTS
Headquarter
via C. Marx 101 Carpi (MO) – ITALY
Ph +39 059 6322111
Fax +39 059 691079

Privacy Policy
Cookie Policy
Credits