Work has begun on the construction of tramline 3.2.1 Libertà-Bagno a Ripoli. Following the start of preliminary road resurfacing works, which will be used as alternative routes during construction, the actual construction works have now commenced. These include the clearance of wartime debris from the site where the park-and-ride facility will be built in Bagno a Ripoli.