CMB Carpi Logo Retina
  • Home
  • Company
    • What We Do
    • Values
    • History
    • Governance
    • Results
    • Commitment
    • Certifications
  • Sustainability
  • Media
    • News
    • Video
    • House Organ
    • Press Release
    • Press Kit
  • Work with us
    • Job opportunities
    • spontaneous application
    • Us Internship
  • Become a supplier
  • Contacts
    • Contacts
    • Contacts Milan Headquarter
    • Contacts Rome Headquarter
  • Projects
  • Facility Management
  • People
  • Safety
  • Innovation
    • Building Information Modeling
    • Success Project
    • Leed Certification
  • IT
  • EN
  • Home
  • Company
    • What We Do
    • Values
    • History
    • Governance
    • Results
    • Commitment
    • Certifications
  • Sustainability
  • Media
    • News
    • Video
    • House Organ
    • Press Release
    • Press Kit
  • Work with us
    • Job opportunities
    • spontaneous application
    • Us Internship
  • Become a supplier
  • Contacts
    • Contacts
    • Contacts Milan Headquarter
    • Contacts Rome Headquarter
  • Projects
  • Facility Management
  • People
  • Safety
  • Innovation
    • Building Information Modeling
    • Success Project
    • Leed Certification
  • IT
  • EN
  • IT
  • EN
03/12/2020

Tramway Line 3

Florence
ITALY

New urban connections for Florence

Mobility in Florence is being updated with the 3.1 tramline, which intersects with the Florence-Scandicci line

built by CMB in 2010. It touches one of the most delicate traffic junctions of the city, the Fortezza da Basso: thanks to the project, this area is now taking on a “green” profile.
CMB has responded to the needs of the Municipality of Florence, offering details on building site operations in every phase. It has coordinated the sub-contracting enterprises and mobility stakeholders: from the councillor’s office to the presidents of local districts, from the road cleaning manager to the police. The goal: completing the project in order to reduce the mobility problems of local citizens and visitors.

THE UNDERGROUND UTILITIES
The work was carried out also deep underground, since it also included the movement and updating of all the relative underground utilities, with the involvement of different enterprise.

icon-gallery
icon-gallery
cmb-Tramvia-3-infrastructure-firenze-gallery-02
cmb-Tramvia-3-infrastructure-firenze-gallery-03
cmb-Tramvia-3-infrastructure-firenze-gallery-04
cmb-Tramvia-3-infrastructure-firenze-gallery-05
cmb-Tramvia-3-infrastructure-firenze-gallery-06
cmb-Tramvia-3-infrastructure-firenze-gallery-07
cmb-Tramvia-3-infrastructure-firenze-gallery-08
cmb-Tramvia-3-infrastructure-firenze-gallery-09
cmb-Tramvia-3-infrastructure-firenze-gallery-10
cmb-Tramvia-3-infrastructure-firenze-gallery-11
cmb-Tramvia-3-infrastructure-firenze-gallery-12
cmb-Tramvia-3-infrastructure-firenze-gallery-13
3.400
meters – track
1.435
mm – track gauge
11
stops
Technical Description

The route of the 3.1 Line runs inside the city of Florence for around 4.5 km: starting from the current Line 1 terminal, it passes one of the city’s most delicate traffic junctions, Fortezza da Basso, where, to avoid congestion between road and rail traffic, two substantial vehicle underpasses have been planned. With regards to the work of art, given the delicacy of the architectural landscape in the Fortezza area, the insertion of underpasses inside the street network (which was designed by the architect, Poggi, in the second half of the 1800s) has been carefully studied; simulated solutions using traffic models have made it possible to declare the sustainability of the project.

The first underpass, 350 m long and completely covered in Santafiora stone, was constructed in the record time of a year and a half. The double and single tramway is composed of a deep reinforced concrete basin inside of which there is a double slab supporting and blocking the tram track. The surface flooring is mainly composed of natural stone effect self-locking blocks.

“It hasn’t been an easy building site, due to its location in the centre of the city. But we’ve managed to minimize the impact on its citizens”.

Tommaso Cacciaguerra
Project Manager

Value of the works
110 million euros
Client
Tram Spa, through a concession agreement of the Municipality of Florence
Role in the project
Complete execution of the construction works for Line 3.1
Completion times
May 2014 – July 2018
see also

Salerno-Reggio Calabria A3 Motorway Cosenza

2016

Road access to the Expo 2015 area Milan

2015

Museo dell’Opera del Duomo Florence

2015
Share this page
Share this page
Back to top
CMB Carpi Logo

P.IVA 00154410369
Registro delle Società di Modena
n. 00154410369 – C.C.I.A.A. 2698
Albo Cooperative n. A100255

©2023 CMB
Cooperativa Muratori e Braccianti di Carpi
Tutti i diritti riservati / All rights reserved

PROJECTS

FACILITY MANAGEMENT

PEOPLE

SAFETY

INNOVATION

COMPANY
What we do
Values
Enterprise’s History
Governance
Results
Commitment
Certifications
Becoming Supplier

WORK WITH US

SUSTAINABILITY

MEDIA
News
Video
House Organ
Press Release
Press Kit

SOCIAL NETWORK
Linkedin
Youtube

CONTACTS
Headquarter
via C. Marx 101 Carpi (MO) – ITALY
Ph +39 059 6322111
Fax +39 059 691079

Privacy Policy
Cookie Policy
Credits