Lorenzo Traini
Site Manager
Degree in Building Engineering – Architecture
At CMB since 2018

From BIM to the tramway
Lorenzo Traini, an engineer with 7–8 years of experience at CMB, joined the Cooperative through a university Master’s programme in BIM
, during which CMB was presented as a benchmark company in the sector. After his first projects in industrial and commercial construction, since November 2022 he has been Site Manager for lots D-E-F (Red Line) and H (Green Line) of the Bologna Tram, the city where he was born and raised.“In Bologna, working closely with the city and the people who live in it requires a particular sensitivity. Every decision must be carefully weighed.”
“Experience is also gained through mistakes, but by now the tramway project is fully up to speed. The results and people’s trust show that the path we have taken is the right one.”
“The progress of the works and the design choices are among the hottest topics, even among friends and family: it is a full immersion, but I understand that a project like this attracts great curiosity.”
“CMB still retains that romantic and traditional, almost family-like side of being a Cooperative. For each member, it means truly being part of the company they work for, sharing its values and goals.”

Projects
MAIN BUILDING SITES INVOLVED IN
> Bonfiglioli plant
> Gran Reno – shopping centre expansion
> Bologna Tram Red Line – Lots D-E-F
> Bologna Tram Green Line – Lot H

