05/07/2024

The dinosaur-shear starts work at the Gaslini Hospital

Work has begun on the construction of tramline 3.2.1 Libertà-Bagno a Ripoli. Following the start of preliminary road resurfacing works, which will be used as alternative routes during construction, the actual construction works have now commenced. These include the clearance of wartime debris from the site where the park-and-ride facility will be built in Bagno a Ripoli.
08/04/2024

Firenze Tramway: Work on the parking lot in Bagno a Ripoli has commenced

Work has begun on the construction of tramline 3.2.1 Libertà-Bagno a Ripoli. Following the start of preliminary road resurfacing works, which will be used as alternative routes during construction, the actual construction works have now commenced. These include the clearance of wartime debris from the site where the park-and-ride facility will be built in Bagno a Ripoli.