Work has begun on the construction of tramline 3.2.1 Libertà-Bagno a Ripoli. Following the start of preliminary road resurfacing works, which will be used as alternative routes during construction, the actual construction works have now commenced. These include the clearance of wartime debris from the site where the park-and-ride facility will be built in Bagno a Ripoli.
A state-of-the-art healthcare facility, capable of competing with the leading hospitals in Northern Europe, is being constructed in Pisa on a 450,000-square-metre site.
Work has begun on the construction of tramline 3.2.1 Libertà-Bagno a Ripoli. Following the start of preliminary road resurfacing works, which will be used as alternative routes during construction, the actual construction works have now commenced. These include the clearance of wartime debris from the site where the park-and-ride facility will be built in Bagno a Ripoli.
CMB’s members approved the 2024-2026 Industrial and Sustainability Plan, aimed at increasing the Cooperative’s turnover to € 1 Billion. Sustainability objectives are integral to the strategic plan
CMB, Finso, Consorzio Integra and CMSA have started the acquisition and valorization of the Monumental Complex of Santa Chiara, in the old town of Pisa. The procedure is announced through the company Nuovo Santa Chiara Hospital.
Giulia Digiovinazzo has been working at CMB since 2002. Having joined the company as a personnel administration officer, today she is Human Resources Manager for the Territories Division.
2022 was a growth year for the CMB Group, which strengthened both its operational and financial solidity, achieving results beyond expectations and confirming the company’s resilience.